Facade commissioning for Jumeirah Lakes Towers projects
Facade commissioning in Jumeirah Lakes Towers
A working envelope at handover
New Dubai & Marina
A documented scope, delivered as one team
An envelope can be fixed, weathertight and still fail at handover because operable components were never brought to their design intent — vents left static during installation, restrictors and hardware never set, louvres and shading elements that do not move as specified. M&M Services Group delivers facade commissioning on Dubai projects, including packages for Jumeirah Lakes Towers and the wider New Dubai & Marina: re-engaging components rendered static during installation, replacing damaged or faulty components, and installing any additional components the envelope requires.
Each step is inspected and function-tested against an inspection and test plan, with live project records and time-stamped images available to your team on OneDrive rather than assembled at the end. Upstream of the tower, pre-launch panel preparation is verified on the ground, where access is inexpensive and safe, instead of from a rope or BMU fifty storeys up.
The local market
Working in Jumeirah Lakes Towers
A cluster-planned free zone of roughly eighty towers arranged in lettered clusters around four artificial lakes, administered by DMCC. Almas Tower anchors the district, surrounded by mixed commercial and residential buildings completed largely between 2006 and 2015 to broadly similar curtain-wall and spandrel specifications. The uniformity of the stock and the presence of active owners' associations mean facade cleaning and repair are often coordinated cluster-wide rather than building by building.
Crews are mobilised to Dubai packages with the same documented methodology — resourcing is confirmed against your programme before appointment.
The same crews also cover Dubai Marina, Jumeirah Islands, Emirates Hills, Jumeirah Heights, Discovery Gardens and the wider New Dubai & Marina.
What we do
The scope this page covers
- Re-engagement of operable components rendered static during installation
- Replacement of damaged or faulty facade components
- Installation of additional components after the initial install
- Function testing against design intent at agreed hold and witness points
- Pre-launch panel preparation under ITP, before panels leave the ground
- Live ITP records and time-stamped images shared through OneDrive
Australian delivery record
The projects behind the method
The delivery record documented on this site is Australian — these are the projects behind the methods, documentation and quality controls we carry into Dubai packages.
Nearby service areas
Facade commissioning around Jumeirah Lakes Towers
Explore the same scope in the closest indexed areas to Jumeirah Lakes Towers.
Questions
What builders ask us
Next step
Where to from here
Projects in safe hands
